| Subcribe via RSS

Upgrade Zimbra

November 26th, 2008 Posted in Mail server

Our mail server have been upgraded from Zimbra CS 5.0.2 to Zimbra 5.0.10.
The upgrade process didn’t take long to process, but the backup and restrore process take a quite long time. Due the performance consideration, we also have to remove the RAID-1 configuration by reinstalling the server.  Because of some problems during the reinstall phase, the process take a very long time. Sleepy and tired, starting the job about at about 19.00, at last we finished the job at about 5.00 in the morning.

Share this article:
  • Print this article!
  • Digg
  • del.icio.us
  • Facebook
  • Google Bookmarks
  • E-mail this story to a friend!
  • LinkedIn
  • Live
  • MySpace
  • RSS
  • Technorati
  • StumbleUpon
  • Twitter
  • Yahoo! Bookmarks

Related posts:

  1. Zimbra antivirus not started
  2. Migrate from M$ Exhange to Zimbra Collaboration Suite
  3. Releasing quarantined emails in Zimbra

Leave a Reply




  • ShoutMix chat widget